Hard Rock Las Vegas Details Three Entertainment Venues for Former Mirage Redevelopment

Hugo Schmitt · Aug 17, 2026

Hard Rock Las Vegas Details Three Entertainment Venues for Former Mirage Redevelopment

Hard Rock Las Vegas redevelopment site on the Strip showing venue planning areas

Hard Rock Las Vegas has filed plans for three separate entertainment venues as part of its redevelopment of the former Mirage property along the Las Vegas Strip, with the full resort scheduled to open in late 2027 according to project documents submitted to Clark County. Observers note that these filings outline distinct performance spaces designed to serve different audience sizes and show formats, replacing existing Mirage facilities while introducing new infrastructure.

Venue Specifications and Replacements

The largest of the proposed spaces is a new 2,000-seat West Theater arena that will be constructed as part of the overall property transformation, while the 5,000-seat Hard Rock Live venue is slated to take the place of the current Beatles Love theater and a repurposed former Mirage Theater will host more intimate performances. Those who've reviewed the Clark County filings note that each venue maintains its own capacity and purpose without overlap in seating or configuration details.

Project documents describe the West Theater arena as a standalone structure positioned within the redeveloped site, separate from the Hard Rock Live replacement and the smaller theater conversion. The Hard Rock Live space carries a 5,000-seat capacity and directly succeeds the Beatles Love production area, whereas the repurposed Mirage Theater shifts focus toward smaller-scale events that fit its existing footprint. Researchers who examined the submissions found that these three venues together form the core entertainment lineup outlined in the applications.

Timeline and Filing Details

The resort target date remains late 2027, and the entertainment venue plans appear in Clark County filings along with related redevelopment documents that specify construction sequences tied to that opening. Those who've studied the submissions observe that the arena and theater projects align with broader site work already underway on the former Mirage grounds. Data from the project documents indicates no changes to the 2027 opening window despite the addition of the three venues.

Interior concept rendering of entertainment spaces planned for Hard Rock Las Vegas

Clark County filings and project documents (West Theater arena application and related redevelopment plans) contain the venue capacities, replacement details, and timeline references that define the entertainment component of the redevelopment. Observers note that the documents separate the West Theater arena construction from the Hard Rock Live build-out and the Mirage Theater repurposing, allowing each project to proceed along its own schedule within the overall resort timeline.

Integration with Property Redevelopment

People familiar with the filings report that the three venues integrate directly into the former Mirage property's transformation, wth the Hard Rock Live replacing the Beatles Love theater footprint and the West Theater arena adding new capacity on the west side of the site. The repurposed Mirage Theater occupies its original location but shifts to support intimate shows rather than its prior configuration. Figures in the Clark County submissions reveal that the combined seating across all three spaces totals 8,000 seats when accounting for the 2,000-seat arena, 5,000-seat Hard Rock Live, and the smaller theater.

Project documents tie these entertainment spaces to the resort's late 2027 opening, with construction milestones listed sequentially so that venue completion supports full operations at that time. Experts have observed that the filings avoid combining the venues into a single multi-use hall, instead preserving distinct identities for each space as described in the applications.

Conclusion

The Clark County filings and project documents establish the three entertainment venues as a defined element of the Hard Rock Las Vegas redevelopment of the former Mirage property, with capacities, replacements, and the late 2027 opening date all specified in the submissions. Those reviewing the materials find that the West Theater arena, Hard Rock Live, and repurposed Mirage Theater together address a range of performance needs without altering the resort timeline. Data contained in the documents confirms the venue details remain consistent across the applications submitted to Clark County.